Drinking Water Branch

Links

  
Summarized Field Sample Results

   Facility Analyte Level List

Return Links

 
 Water System Facilities

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Water System Facility Detail

Water System No. : IL1790030 Federal Type : C
Water System Name : PEKIN FED CORRECTIONAL INST AND PRSNCMP State Type : C
Principal County Served : TAZEWELL Primary Source : GWP
Status : A Activity Date : 09-12-2002
State Asgn ID No. : DISTRIBUTION Type : DS
Facility Name : PEKIN FDL CRCTL INST AND PRSNCMP Activity Status : A
Activity Reason Text : Activity Status Date : 09-12-2002

Sampling Points

Sampling Point Location Type
C01A BLDG D1 RM 102 MECH. RM DS
C01B CLDG C RM C1008 BOILER RM DS
C02A BLDG N, RM N137 MECH RM DS
C02B BLDG H2 RMH1001 BOILER RM DS
DBPMAX BUILDING A ROOM A154 MR
DOWN REPEAT DOWNSTREAM DS
GENDBP DBP HISTORICAL SITE MR
LP2J002 BLDG A DENTALROOM DS
LP2J004 BLDG B KITCHEN ROOM DS
LP2J006 BLDG C GYM ROOM C133 DS
LP2J007 BLDG D1 RESTROOM DS
LP2J008 BLDG D2 RESTROOM DS
LP2J009 BLDG F RESTROOM DS
LP2J010 BLDG T KITCHEN ROOM DS
LP2J015 BLDG H4 RESTROOM DS
LP2J017 BLDG K MEDICAL ROOM DS
LP2J019 BLDG N KITCHEN ROOM DS
OTHER REPEAT OTHER DS
PRIVATE PAY NON EPA PAYMENT DS
RT-EXTRAS ADDITIONAL SAMPLES DS
S2HH1 BUILDING C ROOM 1008 DS
S2HT1 BUILDING A ROOM 154 DS
SP-BOIL ORD BOIL ORDERS DS
SP-CONSTR NEW CONSTRUCTION DS
SP-SPECIALS SPECIAL COLIFORMS
UP REPEAT UPSTREAM DS
 

Annual Operating Periods

Start Month Start Day End Month End Day Effective Begin Date Effective End Date